Skip to content
evrika

Installation

Installed in one visit

The team anchors the plate, assembles the lift, adjusts its travel and remote, and checks operation.

Request installation

We arrange the date on a business day

Process

From request to first use

  1. 01

    Assessment

    We identify the ceiling type and installation point, usually from photographs.

  2. 02

    Installation, 2–3 hours

    Anchor mounting, assembly and connection with the required tools and consumables.

  3. 03

    Adjustment and testing

    The lower stop is set for the room and the mechanism is tested under load.

  4. 04

    Work warranty

    Installation is recorded in the product passport and the manufacturer warranty remains valid.

Preparation

What is required

  • 05

    Ceiling

    A suitable concrete slab or structural frame for the specified anchor load.

  • 06

    Power

    A 220 V socket near the installation point.

  • 07

    Access

    A clear working area below the installation point.

Request

Request installation

If you ordered online, include the EV-XXXXXX order number from your email.